OPCIONALS

Characteristics of the Request

Line of Product:

PROTHEUS

Industry:

MANUFATURING

Module:

SIGAPCP

Routine:

Routine

Technical Name

MATA256

Register of Optionals Group

Routine(s) involved

Technical Name

MATA010

Register of Products

MATA650

Production Orders
MATA712Calculation of MRP
MATA750Master Plan of production
PCPA107Calculation of multi-company MRP
MATA700Sales Estimation

Initial Registrations:

MATA256 - Optional Groups

Parameter(s):

MV_REPGOPC

Entry Point:

 

Related Tickets


Request (ISSUE):MANCORE1-2050

Country(ies):

Brazil

Data Base:

All

Tables:

SGA

Operational System(s):

All


 

 

Description

Funcionality to enable the explosion of optional groups. When selecting a group in a certain level, reuse the same selection in other groups.

Removal of mandatoriness of choice through the flag in optional group register. In the register of the optional groups, enable the indication of whether an optional item for the group in question is mandatory;

Use the validity of the structure to inhibit the selection of the optional.

 

 

Procedure for Configuration

 

CONFIGURATION OF PARAMETERS

 

  1. In the Configurator (SIGACFG), access Environments/Registers/Parameters (CFGX017). Create/configure these parameter(s):
     

Items/Folders

Description

Name:

MV_REPGOPC

Type:

CHAR

Cont. Por.:

N

Description:

INDICATES WHETHER TO REQUEST OPTIONALS IN ALL LEVELS OF THE STRUCTURE

 

 

The validation of this parameter is redone to validate only for the reuse of optionals, and routines must ALWAYS save in the MEMO field. The concept continues the same: If "N", reuse optionals informed in previous level. If "S", request optionals in all levels.

The description of the parameter must be the following: "INDICATES WHETHER TO REQUEST THE OPTIONALS IN ALL LEVELS OF THE STRUCTURE"


 

Procedure for Use

 

 

 

Using with MV_REPGOPC = 'S'

 

 

 

  1.  In the Planning and Control of Production (SIGAPCP), access Transactions/ Production / Production Orders (MATA650).
  2. The system displays the window of production orders.
  3. Create the production order for products with the same optional in several levels of the structure.
  4. When selecting the optional for the first level, check whether it was not selected for other levels.
  5. Check data, then confirm.